Client: Ferro Nickel - Kosovo
Project: Reconstruction of system for lifting and transporting of dust
Brief Description:
-Design, Manufacturing, Installation and putting into operation of the reconstructed system for lifting and transporting dust with increased capacity of 40%, by:
-Increasing the capacity of the elevators on the line 1 and line 2.
-Lead dust from the elevators.
Realized activities:
Reconstruction of the elevators by realizaton of following activities:
- Complete replacement of drive unit; - Complete replacement of take up unit - Manufacturing and replacement of buckets for elevators with increased volume - Replacement of chains for elevators - Reconstruction of unloading of dust - Design and manufacturing of dust transporters for increased capacity, with a central transport chain - Assembly of the overall equipment .
|