FerroNickel-Kosovo
 

 Client: Ferro Nickel - Kosovo

 Project: Reconstruction of system for lifting and transporting of dust





Brief Description:

-Design, Manufacturing, Installation and putting into operation of the reconstructed system for lifting and transporting dust with increased capacity of 40%, by:

-Increasing the capacity of the elevators on the line 1 and line 2.

-Lead dust from the elevators.

Realized activities:

Reconstruction of the elevators by realizaton of following activities:

- Complete replacement of drive unit;
- Complete replacement of take up unit
- Manufacturing and replacement of buckets for elevators with increased volume
- Replacement of chains for elevators
- Reconstruction of unloading of dust
- Design and manufacturing of dust transporters for increased capacity, with a central transport chain
- Assembly of the overall equipment .